Cylindrical borreza with gear face SIZ Twintos
8 goods![](/upload/image_resize/jpg/648_268/e20/e20adffc0d3fd08dc1ed032915f2cdaa.jpg)
JSC "PPE" Twintos " is a manufacturer of metal-cutting
carbide tools used for processing materials
of various hardness: from aluminum to hardened steels.
Exhibitor page at the Enex exhibition
Categories
Cylindrical borreza with gear face SIZ Twintos
![](/upload/image_resize/png/211_211/428/4281de257688b389c6a4f63bc775b620.png)
1 072 rub.
+1 offer from 1 404 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/png/211_211/411/4118342a61d71ad8135365f4d11a6dcb.png)
886 rub.
+1 offer from 1 160 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/png/211_211/d68/d680696aa67a1bf8736925e7dd03b1dd.png)
859 rub.
+1 offer from 1 126 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/png/211_211/16c/16c976cac6873916c6cac585d996af4b.png)
1 070 rub.
+1 offer from 1 402 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/png/211_211/3a5/3a558358be745db2986be34f44e98224.png)
859 rub.
+1 offer from 1 126 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/png/211_211/904/904478e33f3f7ec569716a9bc85b5da4.png)
1 070 rub.
+1 offer from 1 402 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/png/211_211/9c1/9c13c51660ac14f9027b7e47fa42884f.png)
1 072 rub.
+1 offer from 1 404 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/png/211_211/84e/84e791664b3de7b0554ef459c207a34a.png)
886 rub.
+1 offer from 1 160 rub.
Minimum order:
from 10 pieces
Manufacturing time:
28 days
Delivery:
to the address, to the TK terminal