Grinding heads Metabo
9 goods![](/upload/image_resize/jpg/648_268/789/78937226e09154b06bf1f7ebf778a25f.jpg)
Machines, supplies and maintenance – from Nürtingen, Germany
In each machine Metabo invested in the best traditions of Swabian engineering. Since 1924, we develop at its plant in nürtingen the innovative ideas and on the spot turn them into innovative mechanisms and ...
Exhibitor page at the Enex exhibition
Categories
Grinding heads Metabo
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
564 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
847 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
689 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
709 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
750 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
829 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
543 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
823 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
No image
![](/upload/image_resize/jpg/211_211/3a1/3a1b20e4fe5b33c8ded009d325162d33.jpg)
823 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal