Pneumatic hoses Bahco
10 goods![](/upload/image_resize/jpg/648_268/882/8825e537ff99e3a2a949e6b620446eaa.jpg)
A leading manufacturer of hand tools. Innovation is the basis of growth.
Bahco is the flagship brand of SNA Europe.
Bahco is a popular international brand of hand tools. Products
under this brand, the SNA Europe group develops and produces. First
Bahco tools appeared in the era of the indu...
Exhibitor page at the Enex exhibition
Categories
![](/upload/image_resize/jpg/211_211/ab3/lo22fjltsplbbopzeu25jgb6lsfmrrt8.jpg)
5 858 rub.
+1 offer from 5 100 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/313/j385ymj46v73mre77he63a4expyyleoq.jpg)
40 185 rub.
+1 offer from 52 478 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/559/7osq9225p5v9relvok74uqbj57zpqc5x.jpg)
4 581 rub.
+1 offer from 5 983 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/81a/df91a36gt61dpg5qwglivepvgy7ltf6f.jpg)
50 179 rub.
+1 offer from 65 529 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/317/fqe3rzdh48o3uoj903uh9bzht9lnawzm.jpg)
98 444 rub.
+1 offer from 128 562 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/525/9rapzionxe8s6znh387kivhpvotaoc29.jpg)
44 299 rub.
+1 offer from 57 852 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/87a/cru1it4j8s1a0m3famji82jlxvohig0z.jpg)
4 921 rub.
+1 offer from 6 428 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/5c1/l2ceokce0nee5javkonhvfkqtgelaeok.jpg)
78 755 rub.
+1 offer from 102 850 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/6af/ltmc39a46frqhtevi40m3bnvx9kft90g.jpg)
11 042 rub.
+1 offer from 12 471 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/4de/4czkes38wgti0zwemgsrrndk6diurak6.jpg)
11 485 rub.
+1 offer from 14 998 rub.
Minimum order:
from 1 piece
Manufacturing time:
in stock
Delivery:
to the address, to the TK terminal