On the Enex marketplace, products are sold directly by manufacturers and trading companies
Sing in
0
Comparison
0
Order template
0
Cart

TSS GE-700 gas piston power plant of container design

To order template
Remove from template
Compare
Remove from comparison
TSS GE-700 gas piston power plant of container design
TSS GE-700 gas piston power plant of container design
TSS GE-700 gas piston power plant of container design
TSS GE-700 gas piston power plant of container design
Manufacturer
SHH
Brand Country
Russia Russia
Country of origin
Russia Russia
Weight, kg
60
Engine Manufacturer
Baudouin
Number of phases
3
Power, kW
700
Voltage, V
10500
TSS GE-700 gas piston power plant of container design
Vendor code: 038624
Leave feedback
Price not provided by
manufacturer
Manufacturing time:
3 days
To be requested to manufacturer
Request
There are no offers from trading companies
Sell on Enex
Description

Description

The 800 kW TSS GE-800 cogeneration plant in a container is designed to produce heat and electricity using natural gas as fuel. The basic installation option can be configured to meet the needs of a specific facility, the TSS GE-800 is specially designed to meet the diverse requirements arising from the implementation of various projects in the field of cogeneration. The high efficiency of the TSS GE line of installations is based on attention to all details, from the design stage to factory tests. The maximum thermal power of this station is ~860 kW, and the electric power is 800 kW.

Currently, the TSS Group of Companies has organized work to solve problems aimed at import substitution of products used or planned for use in the production activities of enterprises of the Russian Federation.

TSS GE gas piston (cogeneration) power plants are not only high-quality equipment that significantly reduces the cost of electricity and heat, but also one of the solutions to prevent risks associated with the supply of equipment and spare parts by Western companies, software outages due to sanctions against the Russian Federation.

High reliability and unpretentiousness, long service intervals, affordable maintenance – all this, as well as other advantages of this series of installations, allow us to confidently recommend them for the implementation of the most responsible projects related to the construction or development of electric and heat supply systems.

Important advantages of the SS GE series:

  • The main unifying feature of the TSS GE series cogeneration plants is the wide flexibility in forming a model for each specific project.
  • High-power gas piston cogeneration plants can be integrated with central heating networks, while the generated electricity is supplied to the distribution grid.
  • TSS GE installations can be installed in the machine room of an industrial enterprise for integration into an existing power grid or as the basis of such a network providing thermal and electrical energy generation.
  • The engines of the French brand Baudouin need a special introduction, because, being a legendary manufacturer of marine engines, this brand is completely unfamiliar to manufacturers of cogeneration plants, but everything is changing. Today, the Baudouin brand has already found its niche in the production of gas-piston power plants and we can expect a wide distribution of these models, due to the complex of their excellent characteristics and cost benefits.

Advantages of the BAUDOUIN 12M33NG engine

800 kW gas piston units are mass-produced on the conveyor of the TSS GC production complex. The high performance of 800 kW gas piston power plants is ensured by the use of reliable French engines of the Baudouin Moteurs brand in their composition (TSS Group has the status of an official partner of Moteurs Baudouin). They are characterized by a high level of reliability, resource, and increased frequency of maintenance.

Engine and unit

  • The cylinder block is made of high-strength cast iron with inspection hatches for each cylinder;
  • Separate cast iron cylinder heads with 4 valves;
  • Steel crankshaft with induction hardening of the main, connecting rod necks and shafts;
  • Oil-cooled aluminum alloy pistons with high-quality piston rings.

Electrical system

  • 24 V electric starter and charging generator;
  • Engine control unit, intake mixture temperature and pressure sensors, valve timing sensor, water temperature sensor, exhaust oxygen sensor, crankshaft speed sensor, electronic throttle valve, individual ignition coils for each cylinder, high-voltage wires and spark plugs with double platinum electrodes.

Engine control unit

Collects signals from sensors, converts and transmits control signals, controls the operation of the electronic throttle valve, fuel valve, as well as the timing and sequence of ignition in each cylinder.

Air supply and exhaust systems

  • The turbocharger is optimized for operation as part of a generator set;
  • Special air filter with a clogging indicator;
  • Shielded exhaust manifold.

Fuel system

  • The engine runs on a depleted fuel mixture;
  • External mixing in the mixer, electronic control of the gas-air ratio;
  • Woodward electronic control system, Bosch ignition system elements;
  • A fuel system consisting of a pressure reducer, a low-pressure gas filter, a gas mixer, a set of wires, and an engine control unit;
  • Natural gas, wellhead gas, biogas, landfill gas and coal seam gas are used as fuel.

Lubrication system

  • Full-flow centrifugal oil filters;
  • Lubricating oil filter with replaceable filter element;
  • Water-cooled oil heat exchanger.

Variants of the 800 KW TSS GE-800 cogeneration plant

Open execution– an option for placement in a soundproof machine room of an industrial enterprise. This is the most affordable option, while allowing for wide variations in terms of placing elements of the cogeneration plant directly on the site. An open cogeneration plant of 800 kW can be placed in modular structures, at the request of the customer.

The container version of the 800 kW gas piston unitis a standard delivery option for a cogeneration station, in which the technological elements of the system are placed inside and on the roof of a solid frame structure of the container. An 800 kW cogeneration plant in a container can be installed in the open air, while all equipment is reliably protected from both natural precipitation and low ambient temperatures. The TSS GC production complex serially produces several model lines of durable block containers to accommodate various equipment, including cogeneration plants. The latest metalworking equipment and many years of experience in the design and manufacture of non-standard solutions for packaging complex electrical and power equipment allows us to confidently speak about the readiness to implement a project of any complexity in the field of production of modular structures for the placement of cogeneration plants of any capacity and layout.

Contact our specialists right now for advice on the selection of equipment, the production of modular systems for bundling cogeneration plants and for solving any other tasks related to diesel and gas piston power plants.

Specifications:

  • The operating mode is Constant (COP)
  • Electric power, kW - 700
  • Thermal power, kW - 800
  • Voltage (V) - 400, 6300, 10500
  • The ignition system is Electronic
  • Number of phases - 3
  • Frequency, Hz - 50
  • Engine - Baudouin 12M33NG
  • Number of cylinders - 12
  • Crankshaft rotation speed (rpm) - 1500
  • Generator model - TSS-SA 800
  • Electrical efficiency, % - 42.9
  • Thermal efficiency, % - 46.1
  • Overall efficiency, % - 89
  • The type of fuel is Natural gas
  • Fuel consumption, cubic meters/hour - 197.4
  • Specific oil consumption (g/kWh) - 0.2
  • Oil system capacity (l) - 146
  • Cooling system volume (l) - 113
  • Engine displacement (l) - 39.2
  • Overall dimensions (L;W; H; mm) - 14000x3000x3000
  • Weight, kg - 25000
  • Service life before capital repairs (h) - 40,000
  • The service interval is 1000
Characteristics

Characteristics

General Specifications

Manufacturer
SHH
Vendor code
038624
Country of origin
Russia
Brand Country
Russia
Production time
3 days
Minimum order
1

Dimensions of product

Length, mm
14000
Height, mm
3000
Width, mm
3000

Specifications

Voltage, V
10500
Power, kW
700
Fuel
natural gas
Number of phases
3
Cooling system volume, l
113
Engine Manufacturer
Baudouin

Additional characteristics

Frequency, Hz
50
Reviews (0)
Reviews (0)
Terms of delivery

Terms of delivery

Who provides the delivery of goods?

On the Enex marketplace, you order the product directly from its supplier, and Enex employees organize the delivery in the way you choose.

What are the delivery methods?

You can choose any convenient way for you to receive an order:
  • Pickup from partner locations or from the manufacturer's warehouse

    If the manufacturer or trading company has the possibility of pickup, you can pick up your goods yourself or use the services of any transport company. Pickup is free of charge.
  • Delivery to the terminal by a transport company

    Pick up the goods at the nearest terminal of the Business Lines shopping center or DHL in your city. The delivery time and cost depend on your region and the dimensions of the cargo - they will be known at the stage of ordering.
  • Delivery to the door by courier of the transport company

    Receive the goods at your address via a Business Lines courier or DHL. The delivery time and cost depend on the region and the dimensions of the cargo - they will be known at the stage of ordering.
You can find out the exact information about the delivery methods of your order when placing an order or by contacting us by phone 8 800 707-56-00 or email info@enex.market .

How can I keep track of the shipped product?

After you have selected your preferred delivery method and placed an order, you will be able to monitor the change in its status by the number in your personal account, and track the immediate location of the product by the track assigned by the delivery service. You will also receive email notifications about changes in the status of your order. This way, you will always know where your product is located and respond promptly to changes.

Payment methods

Payment methods

Payment by bank card online

You can pay for the goods with bank cards "Visa", "Master Card", "Mir", "JCB". Payment by bank card is made without commission.

To make a transaction, you will need:
  • your bank card number;
  • expiration date of your bank card;
  • CVV code for Visa / CVC code for Master Card: the last 3 digits on the signature strip on the back of the card;
  • confirm the card transaction, for example, with a one-time password from an SMS.

Payment according to the invoice

On the checkout page, select the “Invoice payment” option, and after placing the order, the system will automatically generate and send you an invoice for payment to the specified email address.

In order for the order to be accepted, the invoice must be paid within 3 days.

Payment with bonuses

The buyer can pay part of the order cost (up to 20%) with Enex bonuses. The procedure and conditions for calculating and debiting bonuses are specified in section 7 Rules of sale and delivery.

The seller's indication on the marketplace

Various suppliers of tools and equipment trade on the Enex marketplace. These can be both manufacturers and trading companies. In this case, the Marketplace acts as an agent (Chapter 52 of the Civil Code of the Russian Federation). Enex itself can also act as a seller for some products. Learn more about ordering from different suppliers.

Information about the supplier is always indicated when placing an order, as well as in the invoice (when paying by invoice) or in the receipt (when paying by card). The invoice contains the terms of delivery of the goods, which are accepted by the buyer when paying for it.

Read more about the rules of Sale and delivery
Return of the product

Return of goods

Is it possible to return the purchased product?

If you are not satisfied with the product purchased on the Enex platform, you can return it or exchange it under the conditions specified below. Since buyers conclude direct purchase and sale transactions with manufacturers on the Enex platform, the return of goods is carried out directly to manufacturers.

Rules for the sale of goods.

Return of goods of proper quality

For individuals

The buyer-an individual has the right to refuse the ordered goods at any time before receiving it, as well as after receiving the goods - within 7 days, not counting the day of purchase. The return of the goods is possible if its presentation and consumer properties are preserved, as well as a document confirming the fact and conditions of purchase of the goods.

The buyer does not have the right to refuse a product of proper quality having individually defined properties if the specified product can be used exclusively by the buyer acquiring it.

In case of refusal of the goods of proper quality, the cost of services for the organization of delivery to the buyer is not refunded. Transportation costs for the return of goods of proper quality are borne by the buyer. The method of returning the goods is determined by the buyer.

For legal entities

The return (exchange) of goods of proper quality by the buyer, who is a legal entity (individual entrepreneur), is not allowed, unless otherwise provided by the agreement with the supplier.

Return of goods of inadequate quality

For individuals

The buyer, who is an individual, in cases provided for by law, may return the goods of inadequate quality during the warranty period for the goods and demand a refund of the amount of money paid for the goods. The goods of inadequate quality, in agreement with the buyer, can be replaced with a similar product of proper quality.

For legal entities

The buyer, who is a legal entity (individual entrepreneur), in the event of the transfer of Goods of inadequate quality to him, has the right to make claims provided for in Article 475 of the Civil Code of the Russian Federation.

Distribution of responsibility

In case of return/replacement of low-quality goods, the cost of delivery of the goods is paid by the supplier. The supplier reserves the right to accept the goods of inadequate quality from the buyer and, if necessary, to check the quality of the goods. If, as a result of the examination of the goods, it is established that its shortcomings arose due to circumstances for which the supplier is not responsible, the buyer is obliged to reimburse the supplier for the costs of conducting the examination, as well as the costs associated with its storage and transportation of the goods.

If any defect is found in the product, the manufacturer and (or) the marketplace has the right to require the buyer to provide a photo of the product, the claimed defect, packaging, labeling (nameplate) of the manufacturer.

If the buyer, who is a legal entity (individual entrepreneur), refuses the goods of inadequate quality, such buyer is obliged to return such goods to the supplier. The buyer - an individual can also return the goods to the address of the supplier or Marketplace. 

Transportation costs for the return of low-quality goods are borne by the supplier or Marketplace.

The difference between the shades of the goods in the photo and the real goods is not a sign of poor quality.

For questions about the return or exchange of goods, please contact us by phone 8 800 707-56-00 or by email: info@enex.market .

Full list of refund and exchange conditions

TSS GE-700 gas piston power plant of container design
0 rub.
TSS GE-700 gas piston power plant of container design
TSS GE-700 gas piston power plant of container design
Leave feedback
Vendor code: 038624
Already 247089 products from 810 manufacturers
Selling tools directly from the manufacturer
Comparison of prices of producers and trading companies
Direct dialogue with the manufacturer on commercial and technical issues