Busbar Processing Tools Haupa
5 goods![](/upload/image_resize/png/648_268/30f/30f0e04fe760aa6cacdf4a5906877c60.png)
An effective combination of respect for tradition and the use of modern
production methods have been and remain the main components of the stable
growth of T. M. HAUPA enterprises.
Exhibitor page at the Enex exhibition
Categories
![](/upload/image_resize/jpg/211_211/872/om3nbhmnm58e84jyrybsfrb8tzt5evv1.jpg)
119 380 rub.
Minimum order:
from 1 piece
Manufacturing time:
14 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/21f/q1k303em4o9ntnnypygv5iijgq4ma6hi.jpg)
465 110 rub.
Minimum order:
from 1 piece
Manufacturing time:
14 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/81d/p88wb13rpbux85vre2kjjghj51x5exhi.jpg)
411 161 rub.
Minimum order:
from 1 piece
Manufacturing time:
14 days
Delivery:
to the address, to the TK terminal
![](/upload/image_resize/jpg/211_211/784/cxb97xegpz1khvzhwnzcwkk8eruzmkvh.jpg)
173 950 rub.
Minimum order:
from 1 piece
Manufacturing time:
14 days
Delivery:
to the address, to the TK terminal