New to Enex? Get 500 welcome bonuses when you sign up!
0
Comparison
0
Favourites
0
Cart

Lifting mechanisms ROMEK NN

112 goods
ROMEK company produces a wide range of lifting equipment: cargo slings (rope, textile, chain), metal structures (traverses, grips). It sells a wide range of rigging products, components for the production of slings, lifting devices, construction and storage equipment necessary for lifting, securing ...
ROMEK company produces a wide range of lifting equipment: cargo slings (rope, textile, chain), metal structures (traverses, grips). It sells a wide range of rigging products, components for the production of slings, lifting devices, construction and storage equipment necessary for lifting, securing ...
Exhibitor page at the Enex exhibition
Categories
Lifting mechanisms ROMEK NN
Filters
Universal clamp gripper ZSU 3.0
37 558 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Rope (cable) 3 mm 30 meters AISI304 stainless steel
1 748 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Gripper for sandwich panels ZSP 0.5
10 000 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Gripper for ZKG 10 roll
126 680 rub.
To cart
Manufacturing time: 35 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Welded loop T8 8,0 tn (TY022355)
1 370 rub.
To cart
Manufacturing time: 3 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Grab for lifting barrels ZBA 0.6
8 000 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Welding loop T8 1.12 tn (TY022351)
272 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Welded loop T8 1.12 tn TY022351
272 rub.
To cart
Manufacturing time: 30 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Welded loop T8 3.15 tn (TY022353)
434 rub.
To cart
Manufacturing time: 3 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Welding loop T8 15.0 tn (TY022356)
3 114 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Gripper for sandwich panels ZSPG - 120
4 800 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
2700KG Aluminum Rail Rigging Ring (EBTF001)
255 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Welding loop T8 2.0 tn (TY022352)
327 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Rope (cable) 5 mm 10 meters AISI304 stainless steel
1 346 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Gripper for sandwich panels ZSPG - 150
4 900 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Rope (cable) 3 mm 25 meters AISI304 stainless steel
1 468 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
The rope (cable) for the manipulator (CMU) is digitized. DIN 3069 10.0-19x7-sZ-B-1770/180 100 m
22 857 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Gripper for barrels g/n 1.0 t.
4 199 rub.
To cart
Manufacturing time: 3 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
End cap ZT-3 2,0/4,0
4 201 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
End cap ZT-3 3,2/6,4
5 536 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Rope (cable) 3 mm 15 meters AISI304 stainless steel
907 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Welded loop T8 5,3 tn (TY022354)
880 rub.
To cart
Manufacturing time: 3 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Rope (cable) 4 mm 10 meters AISI304 stainless steel
1 007 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Gripper for sandwich panels ZSPG - 100
4 000 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
The rope (cable) for the manipulator (CMU) is digitized. DIN 3069 8.0-19x7-sZ-B-1770/180 60 m
10 286 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Gripper for sandwich panels ZSP 0.25
8 800 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
The SI bracket is 3.25 tons.
145 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Grab for vertical lifting of ZVB 5 drums
15 633 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Rope (cable) 4 mm 30 meters AISI304 stainless steel
2 888 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Rope (cable) 3 mm 10 meters AISI304 stainless steel
627 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
The SI 2.0 ton bracket.
96 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Welding loop T8 10.0 tn (TY022357)
1 996 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
The rope (cable) for the manipulator (CMU) is digitized. DIN 3069 10.0-19x7-sZ-B-1770/180 120 m
27 429 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Universal clamp gripper ZSU 7.5
65 273 rub.
To cart
Manufacturing time: 35 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Rope (cable) 3 mm 40 meters AISI304 stainless steel
2 308 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Rigging ring for fixing cargo in the floor 1600KG (EBHW091
421 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Universal clamp gripper ZSU 5.0
56 602 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
Vertical clamp gripper ZSV 1.5
28 243 rub.
To cart
Manufacturing time: 28 days
Delivery: ready for, 5 days, to transport company terminal. Pickup possible
The SI 2.0 ton bracket. (pack of 2 pcs.)
198 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
The rope (cable) for the manipulator (CMU) is digitized. DIN 3069 8.0-19x7-sZ-B-1770/180 70 m
12 000 rub.
To cart
Manufacturing time: in stock
Delivery: 5 days, to transport company terminal. Pickup possible
Show more 40

Lifting mechanisms ROMEK NN in Russia at low price

Lifting mechanisms ROMEK NN at price from manufacturers. All models in stocks and for order on online exhibition Enex. Products have certificates of conformity and warranty.
On website has detail information for presented goods in catalog: photos, descriptions, cost, characteristics and users reviews.
Enex - it's official partner for global tools providers. Our users can inexpensive buy Lifting mechanisms ROMEK NN wholesale and retail at best prices. You can pick up order from manufacturer storage or arrange delivery in Moscow and other Russian regions.
Show more